On Tuesday 27 April, the Federal Environment Minister, Dr. Norbert Rottger has officially opened, "Alpha Ventus", the first offshore wind farm, which is located 45 km north of the island of Borkum, Exclusive Economic Zone (EEZ). Dr. Muller GmbH The company stresses the importance it represents the opening of this innovative wind farm with 12 wind motors equipped with a capacity of five megawatts each. Thus aims to produce the energy required to meet annual consumption needs of around 50,000 homes. The launch of Alpha Ventus is a step forward not only for development and technological advancement of the wind sector, but also for research into new projects in this area.
Dr. Muller GmbH The firm based in Ahlhorn (Lower Saxony, Germany) was a leading supplier of parts made of Nomex , Mylar and Thermiflex. The pieces above were used in generators and electronics of this wind farm. For this reason, Dr. Muller GmbH is very proud of the great success of this pioneering project Alpha Ventus park, which was built by the consortium formed by EWE, E. ON and Vattenfall Europe. About Dr.
Muller GmbH Since 1967 Dr. Muller GmbH is a supplier of electrical insulation materials and products thermally conductive and during this time has been characterized by offering a high quality service. The company provides components and isolation systems for the industries of solar and wind as well as for companies that manufacture vehicles and electric motors. A wide variety of SMEs and Industries rely on our products and the application of our technical solutions. Dr. Muller GmbH Zeppelinring Ahlhorn 18 D-26 197 Phone: +49 4435 9710-10 Fax: +49 4435 9710-11 Mail: